Wednesday, May 4, 2011

Trane Controls Major District Contractor Since 2006

Bidding on state funded projects is a highly regulated process. Trane has become a heavily entrenched in ICCSD schools since 2005. Ask yourself if they achieved this by consistently providing the best products and services. There are two documents associated with this post. 061005_Trane Design Info and trane special request.




From: Loehr, Michael J. [miloehr@trane.com]
Sent: Thursday, October 05, 2006 10:10 AM
To: Paul Schultz
Subject: FW: Iowa City West High

Paul,
Just for your information.
This is a summary of my evaluation of the design and how I will proceed with 
pricing.
Please let me know if you have any questions.
Thanks
Mike 

-------

From: Kelly Harrer [mailto:KellyH@De-Pc.com] 
Sent: Thursday, October 05, 2006 10:07 AM
To: Loehr, Michael J.
Subject: RE: Iowa City West High

I do not see any issues with Trane bidding the controls as described below.

Kelly Harrer

-------

From: Loehr, Michael J. [mailto:miloehr@trane.com] 
Sent: Thursday, October 05, 2006 9:23 AM
To: Kelly Harrer
Subject: Iowa City West High

Kelly,
Thanks for your help today.
Summary of our conversation:
 Specifications call out for stand alone heat pump controls in the heat pump 
 section – DDC in controls section. 
   Response- Trane to provide DDC interface to heatpumps. Heatpumps to ship 
   with safeties and water isolation valve that Trane will interface to. 
   The Stats that were specified to be provided by the heatpump manufacture 
   will need to be cancelled before they are ordered. (responsibility of the 
   engineer to confirm) 

 Specifications call out for all controls to be provided by ERV-1 Manufacture – 
 DDC has elaborate points list. 
   Response-ERV unit should ship with Dampers, VFD’s, Fans, Safeties. Trane to 
   add all DDC controls, humidity, co 2 sensors,  as noted on points list 
   including a DDC Controller to meet the sequences as described. 
   In the event the ERV unit comes BACnet or LON compatible, Trane will 
   coordinate with the vendor to take advantage of these options before the 
   unit ships. 
   Trane will NOT be responsible for  added fees required of the ERV vendor for 
   BACnet or LON options. None was specified for them to provide. 

 WEB Access is specified. 
   Trane will have $ set aside for WEB access however, ICCS will determine 
   which direction to head with the WEB server. This project may NOT have WEB 
   access depending on the outcome. 

 Chiller Relocation: 
   Trane will assume responsibility of relocating the wiring as is. We will 
   consider tying in the chiller to the Summit if the Chiller is compatible. 
   The added costs is very minimal to do this. 

 A PC Workstation was specified for the school. ICCS does NOT have PC 
 workstations in any schools and all new expansions and schools are linked to 
 the one primary PC at Facilities department. 
   Trane will NOT include a PC workstation in our proposal. 

 A portable device is specified. 
   ICCS does not require such device, therefore Trane will exclude this from 
   our proposal. 

 5 Year Warranty on valves. Not sure if Labor to replace the valve is to be 
 included. This can be costly (Insurance Policy) Would be cheaper for the owner 
 to handle the labor on a T& M Basis. 
   Trane will provide Material Warranty on valves but NOT labor. This is to 
   save $ - T&M direct with Trane will also minimize markups for a cost that 
   may never happen. 

Kelly,
If you could review and respond asap –make sure we are on the same page.
Thanks for your help,

Michael Loehr 
Account Manager 
Davenport Trane
109 West 55th Street
Davenport, Iowa 52806
563-468-4914 begin_of_the_skype_highlighting            563-468-4914      
end_of_the_skype_highlighting phone
563 340 8168 begin_of_the_skype_highlighting            563 340 8168      
end_of_the_skype_highlighting cell phone
563-391-0277 fax
miloehr@trane.com
A Business of American Standard Companies