Please use the following documents for this timeline:
- (Sep 07, 2007) Conduit Leaking Water
- (Apr 23 - Jun 06, 2008) Conduit still leaking water (email exchange one, exchange two)
- (Apr 03 - Apr 09, 2009) Safety Precautions Finally Discussed
- (April 16, 2009) "Notice of Alleged Safety or Health Hazards"
from the Iowa Division of Labour Services - (Jun 11 - Jun 12, 2009) Electrical service rendered to conduits
Click each photo for larger versions.
(drip rags and drilled holes)
(holes in electrical box)
(water from electrical box)
(rusty switch control box)